In light of the recent catastrophes since the begining of the new millenium, it's on a sad note to have had life lost due to the laxity in the building procedures. During the end of the last millenium, such catastrophes were so minimal and did not cause public alarm. Before, buildings were simply done and barely was anyone involved in putting up a big structure. All businesses seem to have existed in buildings built in the 1970s and before.
Best practices are always, or should be, set for all buildings and their are normally presented in form of technical specifications. In most cases they are standard. All major projects in Kampala should include along them technical documents. The selected contractor is also supposed to produce a construction procedure document indicating how they are to go about the project. Because there are laws existing hence they can work but failure to revise them over certain periods hence the problem. One major problem is when a law to include provision for parking set forth.
QUOTE:
[
The building professionals in Uganda have failed to impress upon us a set of best practices that are ideal for the soils, drainage in Uganda. It is an open secret that even the most elegant structures in the city have cracks: some major, others minor revealing compromised foundations.
]
Showing posts with label nathan. Show all posts
Showing posts with label nathan. Show all posts
Friday, August 27, 2010
THE DEVELOPER'S DRAMA THROUGHOUT HOME CONSTRUCTION.
The developer, also called the-boss/client/owner, is ordinarily faced with two major monsters on a building project, namely, the foundation and the suspended slabs.
1. The foundation.
"Say, how in heavens, can over 75bags of cement get buried in the ground?"
Such has always been the developers's rants when building foundations for their residential houses. And when the ground floor is cast, after taking on another, say, 75bags, the developer is dried up after drying up the cement-store. Rests a bit for say a month or so until the developer garners enough power to continue with the...er...superstructure(construction above the ground floor).
2. The suspended slab
The word 'suspended slab' is an engineering term.
Ideally all those floors not supported directly by the ground are suspended, hence suspended slabs...such as the 1st, 2nd, 3rd floor e.t.c
And before their quotations are complete, you, the developer, are already yelling..."You're kidding, you expect me to give you 150bags of cement in just two days for this little first floor slab".
And not for long, you, the developer, are already looking for a less expensive builder(70% fake) who will conform to your desires, saying that, "hey boss, 70bags can also work, dont worry, I've done it before here and there for 5years "
...and the fracas is already on even before the quotation for the reinforcement bars has been done.
So we have to accept that these slabs are monster-eaters in that the whole lot is best done at once and not in stages. Meaning that you've got to splash the 15m-Ushs(8600USD) all at once for a slab, of say, 150m2 area in less than a week. That's when you feel for the owner...I mean it takes an ordinary middle-class citizen a year or so to earn this money..only for it to be spent in just two days as if...oh gosh!
Then in a bid to save on it, the owner starts getting stupid, thereby resorting to quack builders who are "quote" cheap. Thats why you'll rarely see an engineer or even an architect on a residential building.
The roofing.
Okay by the time the developer survives this far than anything is possible. Ideally the roof shouldnt be a big issue, that's if, you, the developer, wont be alarmed by the quantity of roofing timbers.
Finishes.
And the most annoying item on the building is the finishes. Finishing details are so many that sometimes the beauty is only seen when all these fine-details have been completed...ask the decoration expert. That's when you, the developer, keep on complaining, injecting more money but seeing nothing. Patience you need. You see, finishes on a development is like fine-tuning a musical instrument for the best sound. It might never end. Musicians can attest to this.
--> Nathan.(Apr2009 writing collection)
MSc.Structural Engineering(Tongji Univ. Shanghai, China)
BSc.Civil Engineering (Makerere Univ, Kampala, Uganda)
Member IABSE, UIPE, SEAINT
d-nathan@engineer.com
1. The foundation.
"Say, how in heavens, can over 75bags of cement get buried in the ground?"
Such has always been the developers's rants when building foundations for their residential houses. And when the ground floor is cast, after taking on another, say, 75bags, the developer is dried up after drying up the cement-store. Rests a bit for say a month or so until the developer garners enough power to continue with the...er...superstructure(construction above the ground floor).
2. The suspended slab
The word 'suspended slab' is an engineering term.
Ideally all those floors not supported directly by the ground are suspended, hence suspended slabs...such as the 1st, 2nd, 3rd floor e.t.c
And before their quotations are complete, you, the developer, are already yelling..."You're kidding, you expect me to give you 150bags of cement in just two days for this little first floor slab".
And not for long, you, the developer, are already looking for a less expensive builder(70% fake) who will conform to your desires, saying that, "hey boss, 70bags can also work, dont worry, I've done it before here and there for 5years "
...and the fracas is already on even before the quotation for the reinforcement bars has been done.
So we have to accept that these slabs are monster-eaters in that the whole lot is best done at once and not in stages. Meaning that you've got to splash the 15m-Ushs(8600USD) all at once for a slab, of say, 150m2 area in less than a week. That's when you feel for the owner...I mean it takes an ordinary middle-class citizen a year or so to earn this money..only for it to be spent in just two days as if...oh gosh!
Then in a bid to save on it, the owner starts getting stupid, thereby resorting to quack builders who are "quote" cheap. Thats why you'll rarely see an engineer or even an architect on a residential building.
The roofing.
Okay by the time the developer survives this far than anything is possible. Ideally the roof shouldnt be a big issue, that's if, you, the developer, wont be alarmed by the quantity of roofing timbers.
Finishes.
And the most annoying item on the building is the finishes. Finishing details are so many that sometimes the beauty is only seen when all these fine-details have been completed...ask the decoration expert. That's when you, the developer, keep on complaining, injecting more money but seeing nothing. Patience you need. You see, finishes on a development is like fine-tuning a musical instrument for the best sound. It might never end. Musicians can attest to this.
--> Nathan.(Apr2009 writing collection)
MSc.Structural Engineering(Tongji Univ. Shanghai, China)
BSc.Civil Engineering (Makerere Univ, Kampala, Uganda)
Member IABSE, UIPE, SEAINT
d-nathan@engineer.com
Labels:
cement,
construction,
home,
nathan,
roof,
suspended slab
THE WELDING MACHINE FROM A PLACE CALLED 'KATWE'.
THE WELDING MACHINE FROM A PLACE CALLED 'KATWE'.
And I visited this place called Katwe, and I was to buy a welding machine,locally made as it was cheap running between 400,000ushs to 500,000Ushs.
Prior to that we had bought one from big shop called 'Game' running at around 350,000Ushs. It turns out that the welding machine could not work on mass production of steel products like windows, doors and staircases. The 'Game'people were good,
as they allowed us to take back their product. And so, that's how we turned the
eye to Katwe.
Yeee!!!, support for the locally made stuff.
Now about that welding machine from Katwe!
It was a complete shame on me to see the barely uneducated having made something that works and me, with all the technical knowledge about the machine only knowing it in theory. This, I termed, the fine gap between theory and practice. It had nothing to do with the fact that I couldnt make the machine but the issue was 'why should I make it?' This question if looked at in more details would be the sole basis of why students should go higher institutions of learning..the university.
I was so eager to give this uneducated inventor/copycat more knowledge of what they are producing but it was so hard to change all those electrical engineering terms into the local language.
For example, how do you say 'electromagnetism' in the local language. Or rather when I said the word 'current', everyone got confused with 'current'events...nooo! I had meant electric Current'.
Now after recovering from the fact that a person with no prior knowledge, than
did I take a more detailed 'look' into the machine...oops! it turned out that
the machine was just about, say, just over 50% efficient.
Turns out everything about the machine was not as good as portrayed by the
aper. The aper had done some very good marketing of the product.
In layman's language, a 50% efficient machine simply wastes the remaining 50% of
your electricity consumption just like that. And the friendlier power guys will say, "your bill please!"
Ahh!...guess what comes next...
checkmate once again!!!
like the water-guys,
suffereth we do.
And what would your next move be...
...before you trick the electricity company...
...bypassing the meter...
...in a bit to save on the electricity...
...and specifically that extra 50% waste...?
It would be wise to get advise. For example, observations on this
Katwe-made welding machine showed that;
"1- the way the windings had been done was so exactly poor
2- the laminated plates had been poorly packed, air-gaps reduced efficiency
and likewise leading to more power losses through heat, sound, hysteresis and eddy currents plus all that other jargon. In otherwords, improving the mutual inductance between the two windings was key to a highly functioning welding machine.
And for this reason much power had been lost during the transfer from the primary to the secondary windings thus reducing the effectiveness of the device. This meant that it was not optimised to work as an electricity saving device.
Forsooth making high quality welding machines from Uganda is so possible and just as easy as it was with the vehicle made by the Makerere engineering guys. Later on that vehicular machine.
Now prior to that,
...these guys ignorantly informed me of how their local stuff works better than
imported items...which was partly true. Likewise they had told me of how better they are than the engineering graduates from Makerere...which was so out of context...oops I sorried them ignorant ones.
To clear the air, the engineers from the university can not be compared to those faulty inventions from the un-educated people. There is no comparison point, everyone has their downsides which are exactly 'orthogonal', the meeting point being 'non-productivity to the society'.
For long the Katwe people have been given accolades by investors and government
for being productive, while sharp, but correct, criticisms have been directed to universities.
In actual sense, almost all these products from the barely educated people function at less than that acceptable efficiency, while on the other side, universities have produced educated people who have not been productive but
good grade-getters.
so,
Who tried?
Who didnt try?
who benefited?
You see...
according to the PRESENT SITUATION...
it's better to have a less-efficient product than a degree-person walking with latent knowledge that can not be output
into a real product. In fact I was able to use the low-efficient welding machine to fabricate all the 40windows and 5big doors. The electricity bill was huge though.
Nonetheless,this proves the fact that....
"knowlegde not shared-is-indeed not knowledge".
--> Nathan (Apr2009 writing collection)
The goal of every engineer is to retire
without getting blamed for a major catastrophe!
...Dilbert
DONE
--> Nathaniel.D.M
on Variety engineering.
Civil/Structural engineer!
CG- 3DsMax2009 Animation Professional!
Amateur Astrophysicist/Astronomist!
And I visited this place called Katwe, and I was to buy a welding machine,locally made as it was cheap running between 400,000ushs to 500,000Ushs.
Prior to that we had bought one from big shop called 'Game' running at around 350,000Ushs. It turns out that the welding machine could not work on mass production of steel products like windows, doors and staircases. The 'Game'people were good,
as they allowed us to take back their product. And so, that's how we turned the
eye to Katwe.
Yeee!!!, support for the locally made stuff.
Now about that welding machine from Katwe!
It was a complete shame on me to see the barely uneducated having made something that works and me, with all the technical knowledge about the machine only knowing it in theory. This, I termed, the fine gap between theory and practice. It had nothing to do with the fact that I couldnt make the machine but the issue was 'why should I make it?' This question if looked at in more details would be the sole basis of why students should go higher institutions of learning..the university.
I was so eager to give this uneducated inventor/copycat more knowledge of what they are producing but it was so hard to change all those electrical engineering terms into the local language.
For example, how do you say 'electromagnetism' in the local language. Or rather when I said the word 'current', everyone got confused with 'current'events...nooo! I had meant electric Current'.
Now after recovering from the fact that a person with no prior knowledge, than
did I take a more detailed 'look' into the machine...oops! it turned out that
the machine was just about, say, just over 50% efficient.
Turns out everything about the machine was not as good as portrayed by the
aper. The aper had done some very good marketing of the product.
In layman's language, a 50% efficient machine simply wastes the remaining 50% of
your electricity consumption just like that. And the friendlier power guys will say, "your bill please!"
Ahh!...guess what comes next...
checkmate once again!!!
like the water-guys,
suffereth we do.
And what would your next move be...
...before you trick the electricity company...
...bypassing the meter...
...in a bit to save on the electricity...
...and specifically that extra 50% waste...?
It would be wise to get advise. For example, observations on this
Katwe-made welding machine showed that;
"1- the way the windings had been done was so exactly poor
2- the laminated plates had been poorly packed, air-gaps reduced efficiency
and likewise leading to more power losses through heat, sound, hysteresis and eddy currents plus all that other jargon. In otherwords, improving the mutual inductance between the two windings was key to a highly functioning welding machine.
And for this reason much power had been lost during the transfer from the primary to the secondary windings thus reducing the effectiveness of the device. This meant that it was not optimised to work as an electricity saving device.
Forsooth making high quality welding machines from Uganda is so possible and just as easy as it was with the vehicle made by the Makerere engineering guys. Later on that vehicular machine.
Now prior to that,
...these guys ignorantly informed me of how their local stuff works better than
imported items...which was partly true. Likewise they had told me of how better they are than the engineering graduates from Makerere...which was so out of context...oops I sorried them ignorant ones.
To clear the air, the engineers from the university can not be compared to those faulty inventions from the un-educated people. There is no comparison point, everyone has their downsides which are exactly 'orthogonal', the meeting point being 'non-productivity to the society'.
For long the Katwe people have been given accolades by investors and government
for being productive, while sharp, but correct, criticisms have been directed to universities.
In actual sense, almost all these products from the barely educated people function at less than that acceptable efficiency, while on the other side, universities have produced educated people who have not been productive but
good grade-getters.
so,
Who tried?
Who didnt try?
who benefited?
You see...
according to the PRESENT SITUATION...
it's better to have a less-efficient product than a degree-person walking with latent knowledge that can not be output
into a real product. In fact I was able to use the low-efficient welding machine to fabricate all the 40windows and 5big doors. The electricity bill was huge though.
Nonetheless,this proves the fact that....
"knowlegde not shared-is-indeed not knowledge".
--> Nathan (Apr2009 writing collection)
The goal of every engineer is to retire
without getting blamed for a major catastrophe!
...Dilbert
DONE
--> Nathaniel.D.M
on Variety engineering.
Civil/Structural engineer!
CG- 3DsMax2009 Animation Professional!
Amateur Astrophysicist/Astronomist!
Subscribe to:
Posts (Atom)
